4. FRAME installation and cable connection
⑫ After assembling two or more ASSY BRACKET P-FRONTs, match each other's Z seams.
<Z seam control method>
- Use a driver to open the space between the two modules.
Push driver
Module moving direction
Fig1. Driver usage location
NO GAP
GAP made
Fig2. making GAP
Fig1. method of cabinet moving
44
LED R&D Lab(VD)