Preparation Of Cabinet Installation - Samsung AC Series Install Manual

Led display
Hide thumbs Also See for AC Series:
Table of Contents

Advertisement

2. Preparation of Cabinet installation

◆ Pre-prepare before installation
① To remove SET packaging, a ceiling space 600mm higher than the minimum SET packaging is required.
② If there is not enough space, disassemble the SET packaging in the possible space
and move the cabinet to the installation space.
Ceiling wall
600 +@ mm
SET packing
1982mm
PALLET
Fig.1 Packing disassembly space
16
LED R&D Lab(VD)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lh015iac series

Table of Contents