Download Print this page

Zanussi ULTRA SYSTEM 15 Installation And Servicing page 58

Advertisement

GAS BOILER SYSTEM COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
CONTROLS
Automatic bypass to system
Boiler interlock
ALL SYSTEMS
CENTRAL HEATING MODE
Central heating return temperature
COMBINATION BOILERS ONLY
DOMESTIC HOT WATER MODE
Cold water inlet temperature
CONDENSING BOILERS ONLY
ALL INSTALLATIONS
* All installations in England and Wales must be
Competent Persons Scheme. A Building Regulations Compliance
mbar
mbar OR
to Local Authority Building Control (LABC) either directly or through a
will then be issued to the customer.
Programmable room thermostat
Fitted
Fitted
Fitted
Fitted
OR
OR
OR
Yes
AND
²
AND
²
Optimum start control
Combination Boiler
Yes
Yes
mbar
Yes
Yes
mbar
Temperature
Yes
Ratio
Ratio
Yes
Yes
Yes
Yes
www.centralheating.co.uk
www.centralheating.co.uk

Advertisement

loading

This manual is also suitable for:

Ultra system 18Ultra system 24Ultra system 30