Preparing The New Node - Hitachi 3090 G2 Hardware Reference Manual

Nas platform
Hide thumbs Also See for 3090 G2:
Table of Contents

Advertisement

Node Number
Softwear Version
ETH0 Node IP Address
ETH0 Subnet Mask
ETH1 IP Address (if
applicable)
WWN-Port 1
WWN-Port 2
WWN-Port 3
WWN-Port 4
2. How is the current node connected to the storage?
Direct Connected
3. Is the storage using Host Group Security?
No

Preparing the new node

Prepare the new node prior to installation.
Procedure
1. Obtain the HNAS Factory Reset code for the required level to be installed on the
node.
2. Complete a factory reset of the new node per the documented procedure in order
to install the node at the desired code level.
3. Run nas-preconfig on the node, entering the required information to allow BALI
to start following a reboot of the new node.
For the Admin EVS, enter a valid IP address that is available for use temporarily.
Once this node is joined to the cluster this address will be removed and the existing
Admin IP address in the cluster will be used.
4. Ensure that the new node boots, and that you can connect to it via SSH and login to
BALI.
5. Use the CLI hport-wwn command to get the WWN information for the new node.
Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference
Information of the node to be replaced
Appendix A: Server replacement procedures
Preparing the new node
SAN Connected
Yes
96

Advertisement

Table of Contents
loading

This manual is also suitable for:

3080 g23080

Table of Contents