Hardware setup

Chapter 1.3
The installation guidelines for the SIMATIC S7-300 and the ET 200SP
CAUTION
distributed I/O system must be observed. Please read the corresponding
device manuals \8\ and \6\.
CAUTION
Only switch on the power supply after you have completed and checked
the assembly.
The following graphic shows the hardware setup of the application.
Figure 4-1
24 V
PS
1. Connect your S7-300 station to a 24 V power supply.
2. Connect the S7-300 station to your engineering station via the PROFINET port.
3. Attach the ET 200SP header module, the CM PtP with Base Unit, and finally
the server module to a profile rail.
4. Connect the ET 200SP header module to the SIMATIC S7-300 with an
Ethernet cable.
5. Connect the ET 200SP to a 24 V power supply.
Reading QR Codes with SIMATIC MV320 via ET200SP CM PtP
Article ID: 109474684,
V2.0,
lists the required hardware components.
Engineering Station
S7-300 CPU
ET 200SP CM PtP
10/2021
STEP 7 V17
Serial coupling / RS232
MV320
PROFINET IE