Huawei iSitePower-M User Manual page 66

Hide thumbs Also See for iSitePower-M:
Table of Contents

Advertisement

iSitePower-M (MAP05A1, MAB05B1)
User Manual
Preparing an OT Terminal
● Avoid scratching the core wire when stripping a cable.
● The cavity formed after the conductor crimp strip of the OT terminal is crimped
● Wrap the wire crimping area with heat shrink tubing or insulation tape. The
● When using a heat gun, protect the equipment from being scorched.
Figure 7-3 Preparing an OT terminal
(1) Cable
(4) Hydraulic pliers
Preparing a PV Input Power Cable
● Use the delivered Staubli MC4 EVO2 positive and negative metal terminals and
● Use professional tools to prepare cables.
Issue 02 (2021-12-30)
NO TICE
must wrap the core wires completely. The core wires must contact the OT
terminal closely.
heat shrink tubing is used as an example.
CA UTION
connectors. Using incompatible positive and negative metal terminals and
connectors may result in serious consequences. The caused device damage is
not covered under any warranty or service agreement.
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) OT terminal
(5) Heat gun
7 Electrical Connection
(3) Heat shrink tubing
61

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents