Solar-Grid-Genset Hybrid Scenario - Huawei iSitePower-M User Manual

Hide thumbs Also See for iSitePower-M:
Table of Contents

Advertisement

iSitePower-M (MAP05A1, MAB05B1)
User Manual
Figure 5-10 Solar-genset hybrid scenario network diagram (multiple products
connected in parallel)
In the solar-genset hybrid scenario, the power system works circularly as follows.
The power source preference sequence is solar power > battery > genset.
1.
2.
3.

5.6 Solar-Grid-Genset Hybrid Scenario

Figure 5-11 Solar-grid-genset hybrid scenario network diagram (one product)
Issue 02 (2021-12-30)
If solar power is available, solar power is supplied to loads. If solar power is
insufficient, solar power and battery power are supplied to loads at the same
time.
When solar power is available, If solar power is insufficient, solar power and
battery power are supplied to loads at the same time. When the battery DOD
reaches the specified value, the genset is started.
If solar power is unavailable, batteries supply power to loads. When the
battery DOD reaches the specified value, the genset is started.
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Application Scenarios
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents