3.5
Cable Connections
The simplified diagram below shows power and signal wiring into the analyzer. Conduit may or
may not be required to meet local codes and safety rules.
Figure 3-5
When an Automatic Purge Unit (APU) is used, described in detail in Maxum II Explosion
Protection Safety Standards Manual
42017542/), both power and signal wiring enter the analyzer through separate disconnect
relays that are controlled by the APU.
Figure 3-6
Installation Manual
Installation Manual, 12/2019, 2000595 Rev 1
Simplified cable connection diagram - no APU
Simplified cable connection diagram - with APU
(https://support.industry.siemens.com/cs/document/
Installation Steps
3.5 Cable Connections
19