Download Print this page

Siemens 1-3 Control Technology p1 Series Installation/Replacement Instructions page 8

Lighting panel

Advertisement

Chapter 2
Receiving, Handling and Storage
8. Obtain the original of the carrier
inspection report and forward it
along with a copy of the noted
delivery receipt to the Siemens sales
office. Approval must be obtained by
Siemens from the carrier before any
repair work can be performed. Before
approval can be obtained, Siemens
must have the documents. The
carrier inspection report and/or
driver's signature on the delivery
receipt does not constitute approval
or repair.
Handling
P1 Series Lighting Panel with i-3
Control Technology should be
handled with care to avoid damage
to components and to the frame or
its finish. Refer to Table 2.1 below for
approximate weights of single panel
with full control points which will be
helpful in determining the required
capacity of the handling means.
Panel Size
Estimated Weight
18 Circuit Panel 77 lbs
30 Circuit Panel 98 lbs
42 Circuit Panel 119 lbs
Table 2.1
P1 Panel Main Lug with i-3 Control
Technology Estimated Weight
Storage
P1 Series Lighting Panel with i-3
Control Technology, which if not
installed and energized immediately,
should be stored in a clean dry area
where a uniform temperature
prevents condensation. Preferably,
it should be stored in a heated
building, with adequate air
circulation and protected from dirt
and water. It should be stored where
it is not subject to mechanical
damage.
If this equipment is to be stored
for any length of time, prior to
installation, restore the packing for
protection during that period. Where
conditions permit, leave the packing
intact until it is at its final installation
position.
If the equipment is to be stored in a
cool or damp area, do not completely
cover the equipment, but provide
heat to prevent condensation of
moisture in the equipment.
7

Advertisement

loading