Download Print this page

Siemens 1-3 Control Technology p1 Series Installation/Replacement Instructions page 3

Lighting panel

Advertisement

P1 Panel with i-3 Control Technology
Table of Contents
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5
Chapter 6
2
Introduction
Overview
Scope
Parts Illustration
Receiving, Handling & Storage
Receiving
Identification
Inspection and Unpacking
Shipping Damage Claim Procedure
Handling
Storage
Installation
Preparation for Installation
Lighting Control Assembly Layout
P1 Enclosure Mounting Installation
P1 Interior with i-3 Control Technology Installation
Additional BQD Breaker and CPOD Installation
Location for Low Voltage Conduit
Wiring Installation
Configuring i-3 Controller
Deadfront Installation
Trim/Door Installation
Inspection and Testing
Overview
Inspection
Testing
Energizing
System Diagnostic Test
Maintenance
System Components
BQD Breaker
- Description
- Installing BQD breakers into panel
- Removing BQD breakers from panel
Control POD (CPOD)
- Description
- Installing CPOD into panel
- Removing CPOD from panel
Data Rail
- Description
- Installing data rail into panel
- Removing data rail from panel
Neutral Extension
- Description
- Installing neutral extension into panel
- Removing neutral extension from panel
i-3 Controller
- Description
- Installing i-3 controller into panel
- Removing i-3 controller from panel
Ribbon Cables
- Description
- Ribbon cable connections
4
4
4
5
6
6
6
6
6
7
7
8
8
9
10
10
11
11
12
12
12
12
13
13
13
13
13
13
14
15
15
15
16
17
17
17
20
21
21
21
22
23
23
23
24
24
25
25
26
27
27
27
28

Advertisement

loading