Electrical Connection - Miele CSDA 7001 FL Operating And Installation Instructions

Downdraft extractor
Table of Contents

Advertisement

Installation

Electrical connection

The SmartLine appliance is supplied
with a mains connection cable with
moulded plug ready for connection to a
suitable earthed socket.
The socket should be easily accessible
after the SmartLine appliance has been
installed. If the socket is not easily
accessible, ensure that a suitable
means of disconnection is provided on
the installation side for each pole.
Risk of fire from overheating.
Connecting the SmartLine appliance
to multi-socket adapters or extension
cables can overload the cables.
For safety reasons, do not use an
extension cable or multi-socket
adapter.
Risk of damage from incorrect
connection. Incorrect installation,
maintenance and repairs can be
dangerous to users.
Miele cannot be held liable for damage
or injury (e.g. electric shock) caused by
unauthorised installation, maintenance
or repair work, or by an inadequate or
faulty on-site earthing system.
All electrical work must be carried out
by a suitably qualified and competent
person in strict accordance with
national and local safety regulations.
For safety reasons, we recommend
using a suitable residual current device
(RCD) in the relevant electrical
installation for connecting the
SmartLine appliance.
76
If the mains connection cable is
damaged, it must only be replaced with
a specific mains connection cable of
the same type (available from Miele).
For safety reasons, such replacement
may only be carried out by a suitably
qualified and competent electrician or a
Miele authorised service technician, in
order to avoid a hazard.
These operating instructions and the
data plate indicate the nominal power
consumption and the connection data.
Compare this information with the data
of the on-site electrical connection.If in
any doubt, consult a qualified
electrician.
Temporary or permanent operation with
a self-sufficient or non-mains
synchronous energy supply system
(e.g. isolated networks, back-up
systems) is possible. A requirement for
the operation is that the energy supply
system complies with all current local
and national requirements that apply to
stand-alone, solar and/or battery
systems.
The protective measures provided in
the domestic installation and in this
Miele product must also be assured in
their function and operation in isolated
operation or in non-mains synchronous
operation, or replaced with equivalent
measures in the installation.

Advertisement

Table of Contents
loading

Table of Contents