ENTRANCE GATE MAINTANENCE
6.4
PLACING CROSSING IN SERVICE
Prior to placing the Crossing in service, testing must be performed to verify proper operation.
Ensure the Operating Mode switch is in the Normal position. Perform all tests as specified by
Railroad procedures.
SIG-QG-21-01
Version: A
WHEN PLACING THE GATE IN SERVICE, OBSERVE PROPER
OPERATION WITH TRAIN ACTIVATION OF THE CROSSING AND
PERFORM ANY ADDITIONAL TESTS IN ACCORDANCE WITH
RAILROAD PROCEDURES.
WARNING
6-2
NOVEMBER 2021