Hardware Changes; General Hardware Installation Sequence - HP t505 Troubleshooting Manual

Flexible thin client
Table of Contents

Advertisement

2

Hardware Changes

General Hardware Installation Sequence

To ensure the proper installation thin client hardware components:
1.
Back up any data, if necessary.
2.
If the thin client is powered on:
a.
Turn off the computer properly through the operating system, then turn off any external
devices.
b.
Disconnect the power cord from the power outlet and disconnect any external devices.
c.
Disconnect any external devices or cables, such as a cable lock.
WARNING!
sure to disconnect the power cord from the wall outlet and allow the internal system components
to cool before touching.
WARNING!
plug telecommunications or telephone connectors into the network interface controller (NIC)
receptacles.
CAUTION:
optional equipment. Before beginning these procedures, ensure that you are discharged of static
electricity by briefly touching a grounded metal object. See
for more information.
3.
Remove the side access panel. See
on page 8
4.
Remove any hardware that you will replace.
5.
Install or replace equipment. For removal and replacement procedures, see
Replacing the Battery on page
NOTE:
6.
Replace the side access panel. See
on page
7.
Reconnect any external devices and power cords.
8.
Turn on the monitor, the thin client, and any devices you want to test.
To reduce the risk of personal injury from electrical shock and/or hot surfaces, be
To reduce the risk of electrical shock, fire, or damage to the equipment, do not
Static electricity can damage the electronic components of the thin client or
for more information.
10.
Option kits include more detailed installation instructions.
8.
Removing and Replacing the Side Access Panel
Removing and Replacing the Side Access Panel
General Hardware Installation Sequence
Electrostatic Discharge on page 61
Removing and
7

Advertisement

Table of Contents
loading

Table of Contents