NetCol5000-A050 In-row Air Cooled Smart Cooling
Product
User Manual
Figure 4-48 Securing an outdoor unit onto the second-layer base
1.
2.
3.
Step 7 Connect the beam to the wall by routing M10x30 stainless steel bolts through the
reserved tapped holes on the left and right sides at the top of the base.
----End

4.5.3.3 Vertical Installation Scenario (NetCol500-A120)

Step 1 Secure the base to the ground using four M12x60 stainless steel expansion anchor
bolts, as shown in
Issue 08 (2021-09-17)
Lift the outdoor unit from the front onto the second-layer base, as shown by
(1) in
Figure
4-48.
Secure the outdoor unit to the base using four bracket angles on the side
panel. One M10x30 stainless steel bolt is used on the base side, and two
M6x16 stainless steel bolts are used on the outdoor unit side, as shown in
Figure
4-48.
Secure the last beam on the top to the base using two M10x30 stainless steel
bolts, as shown by (4) in
Figure
Copyright © Huawei Technologies Co., Ltd.
Figure
4-48.
4-49.