Step 3 Follow the onscreen instructions to complete the wizard startup.
● The fan commissioning item is mandatory. After commissioning a component
succeeds, the system automatically performs commissioning for the next
component you selected. If commissioning fails, startup wizard ends. After the
fault is cleared, choose Maint > Wizard Startup to enter the wizard startup
screen for new commissioning.
● If the system is not configured with the electric heater and humidifier
components, the electric heater and humidifier commissioning items will not
appear on the screen.
● If the heating function and humidification function are disabled, you cannot
select the electric heater and humidifier items.
● All the items are selected by default if you first enter the screen where you
select commissioning items. Except that the indoor fan item is mandatory, you
can clear other commissioning items that are not required.
● After the fan commissioning, the electric heater commissioning screen is
displayed. Use a clamp meter to measure the currents cables of KM4 terminal.
Enter the measured values on the screen, and tap Submit within the time limit
displayed on the screen. The controller automatically determines whether the
current of the smart cooling product is within the normal range.
Figure 6-38 Current detection
----End
Issue 08 (2021-09-17)
NO TICE
Copyright © Huawei Technologies Co., Ltd.
6 Power-On Commissioning
165

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents