No.P015 Air Conditioner Wiring Diagram
Cable No.
Container
1
2
3
1
2
3
Cables are reserved here
and installed onsite.
Cable Relation Table
INPUT
OUTPUT
From Device
Container
To Device
Air Conditioner-B1
Main PDB QF5
AC
Air Conditioner-B2
Main PDB QF6
A1
B1
AC
Air Conditioner-B3
Main PDB QF7
AC
Rectifier Cabinet
Air Conditioner-B1
F12
DC
Air Conditioner-B2
A1
Rectifier Cabinet F13
B1
DC
Rectifier Cabinet
Air Conditioner-B3
F14
DC
+/-. Use black and blue
heat shrink tubings to
distinguish them
L1, L2, L3, N, and PE are
distinguished by yellow, green,
red, and blue, and yellow and
green heat shrink tubing.
Power System
Huawei Part Description
Breaker
L1/L2/L3
25031025
ElectronicElectric Cable
-600V/1000V-ZA-RVV-5x4
N
32A/3P
mm^2- Black (5 core wires:
red, yellow, green, blue,
black), Outdoor Cable, CE
PE
+
25030127
Electronic|Electric
/
Cable,600V,UL1015,14AWG,
Black,UL
-
Terminal Relation Table
Terminal Spec From
Terminal Spec From
Part 1
Part 2
14170114
14170114
Tube-4mm
Tube-4mm
14170218
14170218
UT-6mm -M4
UT-6mm -M4
14170218
14170218
UT-6mm -M4
UT-6mm -M4
14170005
14170098
OT-2.5mm -M4
Tube-2.5mm
14170005
14170098
OT-2.5mm -M4
Tube-2.5mm