GE LOGIQ E9 Service Manual page 507

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
8-9-4-2
BEP Side I/O Board - BEP6.x installation
Table 8-137 BEP Side I/O Board - BEP6.x installation
1.
Slowly and carefully slide in the
replacement I/O Board into the BEP,
making sure to avoid hitting components
and circuit pins on both sides of the board.
Pay attention on the guides pins (on the
BEP frame and the slots on the I/O Board),
the guide pins need to be inserted into the
slots. Guide the I/O Board into the BEP
frame.
2.
Re-install the four screws and tighten securely.
3.
Re-install the Option Dongle.
4.
Reconnect the I/O cabling. See:
present on GFI Configuration" on page
5.
Connect the battery cable to PCN1 and the CB to PB cable to PCN2 on the CB. Make sure the
cable connectors are "locked" into place on the CB connections.
6.
Make sure all cables are clear of the BEP Cover and tilt the top of the BEP cover toward the BEP.
Be careful not to pinch any of the cables when installing the BEP cover.
7.
Tighten and secure the thumb screws or screws at the top of the BEP cover, or the three screws
that attach the cover to the BEP.
8.
Replace the side cover.
9.
Perform Functional Checks. See:
8-9-4-4 - Verification
. 2
EV
Steps
NOTICE
and
Chapter 8 Replacement procedures
I/O Board installation guides and slots
Figure 8-57 "BEP6 cable connectors - J5 PCIe to GFI2 is
8-208.
8-9-4-3 - Calibration and
8-9-4-5 "Functional Checks" on page
LOGIQ E9 S
ERVICE
Corresponding Graphic
adjustments,
8-224.
M
ANUAL
8 - 223

Advertisement

Table of Contents
loading

Table of Contents