Mitsubishi Electric MELSEC Q Series Reference Manual page 382

Cc-link ie controller network
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

(d) Operation in REQ instruction execution
• Operation of the own station
Program of own station
REQ instruction
Start contact
Completion device of
own station (D2)
Completion status indication
device ((D2)+1)
(e) REQ instruction execution timing
With J.REQ or G.REQ, processing is executed one after another while the start contact is ON.
With JP.REQ or GP.REQ, processing is performed one time only when the start contact turns ON from OFF.
• When completed normally
Sequence scan
Start contact
Own station CPU
Completion device
(Device specified in (D2))
Completion status indication
device (Device of (D2)+1)
CC-Link IE Controller
Network module
Network module
Sequence scan
Target station CPU
380
END processing END processing
REQ instruction execution
ON
OFF
OFF
OFF
REQ
0
END
OFF
0
END
Remote RUN/STOP
0
END
0
Channel 1
0
END
0
END
0
END processing END processing
REQ instruction execution
completed
ON
ON
When failed
Normal
completion
1 scan
END
0
END
0
END
1 scan
END
0
END

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec qj71gp21-sxMelsec qj71gp21s-sx

Table of Contents