Mcp And Lcp Modules; Table 3.2 Back Panel Parts - Samsung OfficeServ 7200 Technical Manual

Hide thumbs Also See for OfficeServ 7200:
Table of Contents

Advertisement

OfficeServ 7200
TECHNICAL MANUAL
Checking Slots
The WIM board can only be installed in slot 1 of the main cabinet or slot 1 of
the expansion cabinet, and the TEPRI board can only be installed on slots 3, 4
and 5 of the main cabinet and slot 3 of the expansion cabinet.
Ground Connector
Back panel components:
Parts
q Power switch
w Power connector between a
basic cabinet and an extension
cabinet
e AC Power Cord "IN"
r AC LED
t DC LED
y Battery Backup connector

3.2 MCP AND LCP MODULES

This section describes the procedures for setting switches, installing optional daughter
boards, installing the boards in a slot, and how to connect between the MCP and LCP
boards.
The OfficeServ 7200 MCP (Main Control Processor) controls the system operation. The
MCP is required for all configurations and goes in slot 0 of the main cabinet. The LCP
goes in slot 0 of the expansion cabinet.
Figure 3.2 Back Panel Configuration
q
w
e
r
t

Table 3.2 Back Panel Parts

Switches the power of OfficeServ 7200 on/off.
Extends 110V AC power from base cabinet to
expansion cabinet.
Connects to a grounded electrical outlet on a
dedicated circuit.
Is lit for the AC input power.
Is lit for the DC output power (internal DC voltage)
Connects an external battery source "48VDC only"
3.2
Home Page
PART 3 SEPTEMBER 2005
y
Description
Table of Contents
INSTALLATION

Advertisement

Table of Contents
loading

Table of Contents