Step 2 Set parameters for power distribution units on the ECC800-Pro WebUI.
1.
2.
3.
Issue 02 (2020-09-07)
Path
Set the parameters for other general input units in the same way or by
synchronizing parameters.
Path: Maintenance > Parameter Sync
(Optional) To modify the branch signal name of the power distribution unit,
choose System Settings > Signal Name Modify and access the Batch Signal
Configuration to modify the name, and then tap Submit.
The following is an example of how to display two branches for power
distribution unit1.
Choose Monitoring > Power Distribution > General Input Unit > Power
Distribution Unit > Display Configuration, select Branch Information
Display corresponding to QF1 and QF2, and then tap Submit.
Configure the power distribution settings for power distribution unit 1.
Table 5-4 Power distribution settings for a power distribution unit
Path
Parameter Name
Monitoring >
QF1 Rated current (L1)
Power
QF2 Rated current (L2)
Distribution
NOTE
> General
This parameter is not
Input Unit1
displayed for some
> Power
distribution units.
Distribution
Unit >
Running
Parameters >
Unhide All
Advanced
Signals >
Power
Distribution
Settings
Copyright © Huawei Technologies Co., Ltd.
Parameter
Defaul
Name
t
Value
Upper load
80
current
threshold
Lower load
60
current
threshold
Defaul
t Value
32
5 Power-On Commissioning
Setting
When the load current
exceeds the preset
value, an alarm is
generated.
When the load current
exceeds the preset
value, an alarm is
generated.
Description
Rated current 32 A
for each branch.