Installing a Lightning Rod
Solar+Mains Scenario
Adjust the tilting angle of the lightning rod according
to the site latitude.
7
Pole
1. Install mains AC input
power cables.
Nearest
ground
point
Mains
8
Installing the ICC
1. Mark the mounting holes on the concrete floor
and then install the expansion bolts.
Site
Latitude
(Degree)
0–15
16–25
26–30
31–45
2. Check whether the pole needs to be repainted.
Repaint the damaged area of the pole, and then
use the crane to hoist the pole to the foundation.
Mains Scenario
Lightning
Rod Tilt
Angle
15°
25°
35°
45°
3. Secure the pole to the foundation.
Tool
2. Secure the cabinet.
5
Pole BOM
Torque
Number
21540161,
M18 215
21540155
N· m
21540285,
M24 500
21540068,
N· m
21540078
M30 3000
21540069