Siemens SINAMICS S120 Combi Equipment Manual page 197

Hide thumbs Also See for SINAMICS S120 Combi:
Table of Contents

Advertisement

3. Install the lower and upper DC link busbars.
4. Install the 24 V connector (accessories pack of the component to be connected).
Figure 8-2
5. Close the protective cover of the connected component.
6. Mount the front plate on the S120 Combi.
SINAMICS S120 Combi
Manual, (GH9), 07/2016, 6SL3097-4AV00-0BP5
Install the lower DC link busbar
Release the screws.
Turn over the DC link bridge.
Observe the following sequence when
screwing into place.
Screwdriver
Torx T20 or slotted 1.2 x 6
Tightening torque
1.8 Nm
S120 Combi and Motor Module with installed 24 V connector
Electrically connecting Motor Modules and DC link components
8.3 Connection of DC link busbars and 24 V busbars
Install the upper DC link busbar
Release the screws.
Turn over the DC link bridge.
Observe the following sequence when
screwing into place.
197

Advertisement

Table of Contents
loading

Table of Contents