Huawei FusionModule2000 Installation Manual page 61

Smart modular data center, 2000 mm high cabinets, single-row aisle containment, 380 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Align the upper and lower holes before tightening screws.
The tail frame side with anchor bolts should face the cabinet bottom.
Figure 3-35 Securing the tail frame
Step 7 Install the hinges and connecting plates removed in
the tail frame.
Step 8 Install the PDC rear door on the tail frame.
After installing the PDC rear door, ensure that ground cables are properly connected to the
cabinet and PDC rear door.
----End
Issue 04 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
Step 4
on the corresponding positions on
52