Huawei FusionModule2000 Installation Manual page 60

Smart modular data center, 2000 mm high cabinets, single-row aisle containment, 380 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Step 4 Remove the hinges and connecting plates from the PDC rear door, as shown in Figure 3-34.
Put aside the hinges and connecting plates as they are needed in follow-up installation
processes.
Figure 3-34 Removing the PDC rear door mounting kit
Step 5 Move the tail frame installed with accessories and upper sealing plates to the cabinet rear door,
and adjust the anchor bolts of the tail frame so that the fail frame top is flush with the cabinet
top.
Step 6 Secure the tail frame to the PDC using eight M5 tapping screws, as shown in Figure 3-35.
Issue 04 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents