FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Step 4 Lay out the PDU2000 cables on the top of the cabinet and reinstall the rodent-proof mesh, as
shown by (4) in Figure A-43.
Step 5 Install the PDU2000 cables for other IT cabinets in the same way.
----End
Follow-up Procedure
Before connecting the power plug of a device to the PDU2000, loosen the locking device on
the PDU2000. After connecting the power plug, tighten the locking device.
A.8 Cable Routes Inside an IT Cabinet
Figure A-44, Figure A-45, and Figure A-46 show the routes of the cables out from the front of
customer equipment.
Figure A-44 Cable route along a horizontal cable manager
(1) Small cable ring
(3) Customer equipment
Issue 04 (2017-06-30)
The number of cables and holes shown in the figure is for reference only.
Route cables neatly inside the IT cabinet by following instructions in 10.1 System Cabling Rules.
Signal cables or weak-current cables inside cabinets are sorted by cable managers, cable rings, and
cable trays.
The cable colors shown in figures are for reference only.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(2) Cable manager
A Appendix