ABB AMA Series Manual page 140

For induction motors and generators
Table of Contents

Advertisement

5 Electrical installation
Network variation:
Space heater operation:
Space heater for slip ring unit:
5.1 Insulation resistance test
Stator winding (1 min., 1000 VDC):
Stator winding (15 / 60 s. or 1 / 10 min.):
Rotor winding (1 min.):
Exciter stator (1 min., 500 VDC):
Space heater:
Temperature detectors:
N-end bearing insulation:
5.2 Accessories resistance test
Stator 1 Pt 100:
Stator 2 Pt 100:
Stator 3 Pt 100:
Stator 4 Pt 100:
Stator 5 Pt 100:
Stator 6 Pt 100:
Bearing Pt 100 D-end:
Bearing Pt 100 N-end:
Air temperature 1 Pt 100:
Air temperature 2 Pt 100:
Anti-condensation heater:
3BFP 000 050 R0101 REV E
no
yes, voltage:______-______V, frequency:_____-______Hz
no
manual
no
yes, voltage:_____________V, power:_______________W
Ω,
__________M
tested by________ kV, winding temperature:
,
PI =__________
tested by________ kV, winding temperature:
Ω,
__________M
tested by________ kV, winding temperature:
Ω,
__________M
tested by________ kV, winding temperature:
__________M
(500 VDC)
__________M
(100 VDC)
__________M
(100 VDC)
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
Manual for Induction Motors and Generators
automatic, controlled by:_________________
Commissioning Report - 125
______º
C
______º
C
______º
C
______º
C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents