Power Supply; Sensor Coils; Power Sensor Cabling Diagram; Power Sensor Kit - GE AK-2-50 Maintenance Manual

Low-voltage power circuit breakers
Table of Contents

Advertisement

5.
~eplace
i°:
reverse
order.
.
6.
Check positive trip to obtain approx.
1/32"
,-,vertravel after armature is moved sufficiently
to trip the breaker.
!Power
Supply (F~g. 34)
.
1.
Remove
trip
solenoid
wires
from
the
term-
inal board on Power Supply.
·
·
I
2.
Remove
three boltsholdingmountingbrack-
et to
mech~sm
frame.
3,
Remove w~ring cleats
4.
Remove disconnect plug by alternately
loosening two retaining screws.
5.
Remove·
Power
Supply Unit with control
wiring.
6.
Reassemble in
reverse
order.
SENSOR Coils (AK-3-50)
Only_
(Fig.
32)
1.
Disconnect J_>lug
between
the
Power
Supply
Unit and the sensor coils
and
rempve tapped
screw holding female
plug
to
breaker
mechanism
frame •
.
2.
Separate front frame from back frame
as
described
under
SEPARATION
OF
FRONT
&
REAR
FRAMES.
:.
Fit;. 38.
(7612-6-2)
Grow1d Sensor
Coil
(Remotely Located)
1.
Terminal
2.
External Ground
Sensor Con
3.
White
Polarity
Dot
Low
Voltage
Power Circuit
Breakers GEK-7303
Fig. 37 (0133C9018}
Power
Sensor Cabling
Diagram
·
Fig. 39 (8039962) Power Sensor Kit

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents