Schedule Configuration Example - HP 10500 Series Configuration Manual

Hide thumbs Also See for 10500 Series:
Table of Contents

Advertisement

Step
8.
Specify an execution
time table for the
periodic schedule.

Schedule configuration example

Network requirements
As shown in
To save energy, configure the device to perform the following operations:
Enable the interfaces at 8:00 a.m. every Monday through Friday.
Disable the interfaces at 18:00 every Monday through Friday.
Figure 51 Network diagram
Scheduling procedure
# Enter system view.
<Sysname> system-view
# Configure a job for disabling interface GigabitEthernet 1/0/1.
[Sysname] scheduler job shutdown-GigabitEthernet1/0/1
[Sysname-job-shutdown-GigabitEthernet1/0/1] command 1 system-view
[Sysname-job-shutdown-GigabitEthernet1/0/1] command 2 interface gigabitethernet 1/0/1
[Sysname-job-shutdown-GigabitEthernet1/0/1] command 3 shutdown
[Sysname-job-shutdown-GigabitEthernet1/0/1] quit
# Configure a job for enabling interface GigabitEthernet 1/0/1.
[Sysname] scheduler job start-GigabitEthernet1/0/1
Command
Figure
51, two interfaces of the device are connected to users.
Execute the schedule at an
interval from the specified time
on:
time repeating at time
[ month-date [ month-day | last ]
| week-day week-day&<1-7> ]
Execute the schedule at the
specified time on every specified
day in a month or week:
time repeating [ at time [date ] ]
interval interval-time
224
Remarks
By default, no execution time is
specified for a schedule.
Executing commands clock
datetime, clock summer-time, and
clock timezone does not change the
execution time table that is already
configured for a schedule.

Advertisement

Table of Contents
loading

Table of Contents