Control Cable Terminal And Lead-Through Data - ABB ACH580 Series Installation, Operation And Maintenance Manual

Hide thumbs Also See for ACH580 Series:
Table of Contents

Advertisement

ACH580 Installation, Operation and Maintenance Manual

Control cable terminal and lead-through data

Imperial control cable lead-throughs, wire sizes and tightening torques (T) are given
below.
Frame
size
R1
R2
R3
R4
R5
R6
R7
R8
R9
Metric control cable lead-throughs, wire sizes and tightening torques (T) are given
below.
Frame
size
R1
R2
R3
R4
R5
R6
R7
R8
R9
Cable
lead-throughs
+24V, DCOM, DGND, EXT. 24V
Max
Holes
cable
size
Wire size
pcs
in.
3
0.67
24...14
3
0.67
24...14
3
0.67
24...14
4
0.67
24...14
3
0.67
24...14
4
0.67
26...14
4
0.67
26...14
4
0.67
26...14
4
0.67
26...14
Cable
lead-throughs
+24V, DCOM, DGND, EXT. 24V
Max
Holes
cable
size
Wire size
pcs
mm
3
17
0.2...2.5
3
17
0.2...2.5
3
17
0.2...2.5
4
17
0.2...2.5
3
17
0.2...2.5
4
17
0.14...2.5
4
17
0.14...2.5
4
17
0.14...2.5
4
17
0.14...2.5
Control cable entries and terminal sizes
terminals
T
AWG
lb·ft
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
Control cable entries and terminal sizes
terminals
T
2
mm
N·m
0.5...0.6
0.5...0.6
0.5...0.6
0.5...0.6
0.5...0.6
0.5...0.6
0.5...0.6
0.5...0.6
0.5...0.6
DI, AI/O, AGND, RO, STO
terminals
Wire size
T
AWG
lb·ft
26...14
0.4
26...14
0.4
26...14
0.4
26...14
0.4
26...14
0.4
26...14
0.4
26...14
0.4
26...14
0.4
26...14
0.4
DI, AI/O, AGND, RO, STO
terminals
Wire size
T
2
mm
N·m
0.14...1.5
0.5...0.6
0.14...1.5
0.5...0.6
0.14...1.5
0.5...0.6
0.14...1.5
0.5...0.6
0.14...1.5
0.5...0.6
0.14...2.5
0.5...0.6
0.14...2.5
0.5...0.6
0.14...2.5
0.5...0.6
0.14...2.5
0.5...0.6
ACH580-01 Installation
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents