Figure 3-79: Module #6 To Module #7 Signal Cabling - Samsung 136S Installation Manual

Lithium ion battery system for ups
Hide thumbs Also See for 136S:
Table of Contents

Advertisement

Connect the signal cable ―WIRE ASSY MODULE TO MODULE #1" from Module #6 ―IN‖ to Module
7.
#7 ―OUT.‖
Signal cables connecting Module #7 to #8, #8 to #9 and #9 to #10 will be installed in 3.9.8 Rack
Fuse and Additional Module Signal Cable Connection.
Connect the signal cable ―WIRE ASSY MODULE TO MODULE #1" from Module #10 ―IN‖ to
8.
Module #11 ―OUT.‖
ET003222373
English 4/2018. Rev 0.0

Figure 3-79: Module #6 to Module #7 Signal Cabling

Figure 3-80: Module #10 to Module #11 Signal Cabling
.
Assembling the Product