3.2 Installation and Assembly Procedure

This product must be installed and assembled by following the procedure below:
1. Preparation
Stage
 Preparation Stage
Procedure
Unpacking
Ground wire and tools
Recommended tools and instruments
Appearance inspection
 Rack Anchoring Stage
Transport the rack frame to the installation location after unpacking
Arrange the rack frame after checking the positions of holes in the frame and anchoring points
Perform the anchoring and ground connections
 Rack Installation Stage
Transport the battery modules to the installation location
Place the battery modules in the rack frame
Insert the Switchgear assembly in the rack frame
Insert the SMPS assembly in the rack frame
After all subassemblies are inserted in the rack frame, attach the subassemblies to the rack frame
Connect the busbars
Connect the signal cables from switchgear to module, and module to module
Connect the signal cables from switchgear to switchgear
 System Installation Stage
Connect the SMPS assembly
Perform installation checks
Prepare the items for BMS configuration
Configure the BMS EEPROM settings
ET003222373
English 4/2018. Rev 0.0
2. Rack Anchoring
Stage

Figure 3-1: Installation Procedure

.
Assembling the Product
3
3. Rack
Installation
Installation Stage
Stage
4. System
9