Assembling the Product
3
Two anchor points (not rated for seismic event)

Figure 3-5: Clearance Distance for Multiple Rack Frames Installed Rear-to-Rear

1. After unpacking the rack frame, transport it to its installation location.
2. Arrange the rack frame after verifying that the holes in the frame and anchoring points are aligned.
3. Remove the side panels for cabinets attached side by side. Remove rear covers when rear service access is
provided.
4. Connect four anchoring points on the bottom of the rack.
NOTICE
Anchor the frame with M16 bolts and nuts.
The fastening torque should be 140Nm / 100ft lbs.
Check the rack and other parts for distortion caused by unpacking.
18
Bottom of Rack
Four anchor points (Telcordia Zone 3)
ET003222373
English 4/2018. Rev 0.0