ABB COM600 Series User Manual page 67

Dnp 3.0 serial master (opc) substation management unit
Hide thumbs Also See for COM600 Series:
Table of Contents

Advertisement

1MRS756567
Requires Data Link Layer Confirmation:
[ ] Never
[ ] Always (not recommended)
[ ] When reporting Event Data (Slave devices only)
[ ] When sending multi-fragment responses (Slave devices only)
[ ] Sometimes. If 'Sometimes', when? ______________________________________________
[x] Configurable, Process Data Confirmation IED property
Timeouts while waiting for:
Data Link Confirm
[ ] None [ ] Fixed at _________ [ ] Variable [x] Configurable, Channel Header Timeout
Complete Appl. Fragment
[ ] None [ ] Fixed at _________ [ ] Variable [x] Configurable, IED Transport Timeout, Reply Timeout
Application Confirm
[ ] None [ ] Fixed at _________ [ ] Variable [x] Configurable, CT IED Confirmation Timeout
Complete Appl. Response
[ ] None [ ] Fixed at _________ [ ] Variable [x] Configurable, AT IED Application Timeout
Others:
Complete data link frame: Channel Response Timeout
Response to a request: IED Reply Timeout, Application Response Timeout
Sends/Executes Control Operations:
WRITE Binary Outputs
[x] Never [ ] Always [ ] Sometimes [ ] Configurable
SELECT/OPERATE
[ ] Never [ ] Always [ ] Sometimes [x] Configurable
DIRECT OPERATE
[ ] Never [ ] Always [ ] Sometimes [x] Configurable
DIRECT OPERATE - NO ACK
[ ] Never [ ] Always [ ] Sometimes [x] Configurable
Count > 1
[x] Never [ ] Always [ ] Sometimes [ ] Configurable
Pulse On
[ ] Never [ ] Always [ ] Sometimes [x] Configurable
COM600 series, Version 5.0
DNP 3.0 Serial Master (OPC) User's Manual
67