4-Way Server Blade: Installing/Removing The Control Panel Board - Fujitsu PRIMERGY BX600 User Manual

Hide thumbs Also See for PRIMERGY BX600:
Table of Contents

Advertisement

Updates

4-way server blade: Installing/removing the control panel board

The electronic elements of the control and connection panel of the 4-way server
blade are located on a board that is connected to the system board of the server
blade via a foil cable. The control panel board is attached to the chassis of the
4-way server blade above the mounting location for the heat sink of CPU 2.
Before installing CPU 2, you must remove the control panel board from
i
its fastening on the front of the 4-way server blade.
Removing the control panel board
Before handling the modules, you must electrostatically discharge
!
yourself (e.g. by touching a grounded object). Always hold electrostatic-
sensitive devices by the edges and place them on a pad which is free of
electrostatic charge.
Any devices or tools that are used must be free of electrostatic charge.
To ensure this, you should use a suitable wristband or grounding cable
that connects you to the external chassis of the system unit.
U41057-J21-Z146-1-76
March 2006
Update revision 08.2004
02
BX600
185

Advertisement

Table of Contents
loading

Table of Contents