Watering Days Setup - Toro 53805 Installation & Programming Manual

Lawn master ii landscape timer
Table of Contents

Advertisement

Available languages

Available languages

WATERING DAYS Setup

The WATERING DAYS setup will dictate when to activate the selected watering program.
Lawn Master II allows you to select Weekdays, ODD days only or EVEN days only watering
schedules. When selecting Weekdays schedule, you can disable specific days.
Step 1 – Place the function dial to the WATERING DAYS
Step 2 – Press
Step 3 – For Weekday scheduling, press
the
To disable a specific weekday, press
Press
To enable a non -watering day, press
Press
Step 4 – For ODD scheduling, press
to activate. The
scheduling, Lawn Master II will only water on the ODD numbered days in the
calendar month. ODD scheduling will not water on the 31st but resumes on the 1st.
Step 5 – For EVEN scheduling, press
to activate. The
scheduling, Lawn Master II will only water on the EVEN numbered days in the
calendar month.
Step 6 – Repeat Steps 2–5 for the remaining programs as necessary.
Step 7 – Return the function dial to
Downloaded from
www.Manualslib.com
to select the program being modified. Select from
PRG
symbol are designated as an active watering day.
to disable. The
to enable. The
symbol should be displayed above ODD. By selecting ODD
symbol should be displayed above EVEN. By selecting EVEN
manuals search engine
until MON–SUN is displayed. All weekdays with
or
until the desired weekday is flashing.
icon will be displayed above the non -watering day.
or
until the desired weekday is flashing.
icon will be displayed above the active day.
or
until ODD is flashing. Press the
or
until EVEN is flashing. Press the
RUN
when finished.
position.
A
B
C
,
or
.
button
button


Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

53806

Table of Contents