Adjustment Of Developer Unit - Toshiba e-studio200l Service Handbook

Hide thumbs Also See for e-studio200l:
Table of Contents

Advertisement

3.9

Adjustment of Developer Unit

3.9.1
Doctor-to-sleeve gap
Adjustment tool to use: Doctor-sleeve jig
<Procedure>
(1)
Perform the adjustment code "05-280".
(2)
Take out the process unit from the equipment.
(3)
Take out the developer unit from the process unit.
(4)
Remove 2 screws and take off the developer
material cover and discharge the developer
material.
Note:
Note:
Discharge the developer material from the
rear side, being careful not to let it be scat-
tered on the gear.
(5)
Turn the adjustment screw to widen the gap
so that the jig can be inserted in it.
(Turning the screw clockwise widens the
gap)
© 2004 - 2010 TOSHIBA TEC CORPORATION All rights reserved
Fig. 3-44
Fig. 3-45
e-STUDIO200L/202L/203L/230/230L/232/233/280/282/283
3 - 51
3
Developer
material cover
Screw
ADJUSTMENT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents