HP 10504 Installation Manual page 111

10500 switch series
Hide thumbs Also See for 10504:
Table of Contents

Advertisement

patch cord technical specifications,
performance-based type technical
specifications,
87
pigtail cord technical specifications,
pin assignment technical specifications,
pinout technical specifications,
pinout-based type technical specifications,
QSFP+ cable technical specifications,
QSFP+ to SFP+ cable technical
specifications,
93
QSFP+ to SFP+ transceiver cable technical
specifications,
73
removing from switch,
removing the console cable,
removing the grounding cable,
removing the optical fiber,
removing the power cord,
removing the twisted pair,
replacing QSFP+ cable,
replacing QSFP+ to SFP+ cable,
replacing SFP+ cable,
RJ-45 connector technical specifications,
SC fiber connector technical specifications,
SFP+ cable technical specifications,
switch to network through optical fibers,
switch to network through twisted pair
cables,
43
technical specifications (Appendix D),
tie parameters,
94
ties,
94
transceiver cable technical specifications,
type technical specifications,
cage nut (19-inch rack), 8,
card
LED description,
81
LPU installation,
22
MPU installation,
power consumption,
repackaging,
100
replacing,
51
switching fabric module installation,
CFP
port LED description,
CFP module
installing,
29
90
91
87
92
98
98
98
99
98
99
54
54
54
92
86
87
12
22
62
22
83
chassis
10500 airflow,
10508-V airflow,
19-inch rack cabling recommendations,
89
19-inch rack general cabling recommendations,
19-inch rack mounting bracket attachment to
88
chassis,
cooling and ventilation,
grounding recommendation,
rack dimension requirements,
removing from rack,
repackaging, 100,
structure,
views,
weights and dimensions,
cleanness
installation site,
optical fiber safety precautions,
CLI
troubleshooting methods,
troubleshooting switch during operation,
87
compatibility matrixes,
91
configuring
authentication on user interface,
43
basic access function,
IRF basic settings,
setting environment,
switch,
troubleshooting configuration terminal
problems,
73
verifying IRF fabric configuration,
confirming installation preparations,
connecting
AC power cord,
DC power cord,
first time switch access,
IRF physical ports,
planning IRF connections,
power cord,
QSFP+ cable,
QSFP+ to SFP+ cable,
SFP+ cable,
switch to network, 36,
switch to network through optical fibers,
switch to network through twisted pair cables,
105
5
5
15
5
100
102
59
59
60
3
45
66
42
34
36
41
45
26
27
36
34
33
26
29
29
29
43
94
94
4
6
91
46
42
35
8
43
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

10508-v1050810512

Table of Contents