Ductwork, Wiring Locations - GE ZVC30LSS Installation Instructions Manual

Hide thumbs Also See for ZVC30LSS:
Table of Contents

Advertisement

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the insert
sleeve. Mark the exact centerline location.
The ceiling structure must be capable of
supporting the weight of the insert sleeve
(approximately 100 pounds) and any
inadvertent user contact loads.
• Measure from the top of the cooking
surface to the bottom edge of the insert
sleeve. Add insert sleeve installation height.
Mark that location.
• Use a level to draw a straight horizontal
pencil line on the wall.
NOTE: House duct should drop to 11-1/2"
above bottom edge of insert sleeve.
Location of house duct is important
because it must align with vent of
damper plate assembly.
Ceiling ducting:
If ductwork will vent straight up to the ceiling:
• Use a level to draw a centerline straight up
to the ceiling.
• On the ceiling, measure 5-1/2
the back wall to the centerline of an
"
8-1/2
hole.
Wall Ducting:
If ductwork will vent to the rear:
• Use a level to draw a centerline straight
up to the ceiling.
"
• Measure at least 16
above the pencil line
that indicates the bottom installation height,
to the centerline of an 8-1/2
(Hole may be elongated for duct elbow.)
HOUSE WIRING LOCATION:
• The junction box is located inside the top left
side of the hood.
• Wiring should enter the back wall at least
"
15
above the bottom of the insert sleeve,
"
and within 6
of the left side of the
centerline.
Wall Installation Preparation
16" above pencil
line indicating
bottom of hood
4" liner height
30" Min.
36" Max.
installation
height
"
from
36" from
floor to
countertop
"
dia. duct hole.
5-1/2" from
rear wall to
centerline
16" above pencil
line indicating
bottom of hood
11-1/2"
36" from
floor to
countertop
Side view
12
11-1/2"
4" liner height
30" Min.
36" Max.
installation
height
Front view

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zvc36lssZvc48lss

Table of Contents