Do you have a question about the EB3 and is the answer not in the manual?
Questions and answers
Mike ward
February 10, 2025
What descaling compound should I use for Lincat Boiler
1 comments:
Mr. Anderson
February 11, 2025
The Lincat EB3 boiler is supplied with a pack of de-scaling compound. Only parts recommended by the manufacturer should be used for maintenance, including descaling.
Troubleshooting Spare Parts 14 - 15 Tank assembly Base assembly Body assembly 16 - 17 Wiring and Circuit Diagrams EB3 Wiring diagram EB4 Wiring diagram EB6 Wiring diagram Circuit diagram Spare Parts List Replacing Parts 19 - 20 Thermostat Contactor...
• Instruction booklet. • Guarantee card. The EB3 model is supplied with a 3 pin bonded plug and lead fitted with a 13Amp fuse as standard. The EB range of boilers is surface mounted and carries the option of being wall mounted. Wall fixing kits are an optional extra.
Do not place foreign objects in the tank of the appliance. Parts explosion, circuit and wiring diagrams are the sole property of Lincat and must not be reproduced without the consent of the manufacturer.
• All electrical work must comply with all relevant wiring regulations and carried out by a qualified electrician. • EB3 models require a 13Amp-supply socket. • EB4 models require a 20Amp supply. • EB6 models require a 30Amp single or multi-phase supply.
Instruction to the owner of the appliance must be given on how to isolate the appliance in case of emergency. The work surface must have a minimum depth of 600mm. The spillage tray must be fitted with the appliance EB6 dimensional details EB4 dimensional details EB3 dimensional details...
IS09 ECN2087 Wall Bracket Installation Where the appliance is to be mounted to a wall ensure the wall is constructed of a suitable material to sustain the working weight of the boiler. • To fit the wall bracket make a centre mark on the wall at approximately 1400mm from the floor.
All appliances must be earthed. The EB3 model is supplied with a 3 pin bonded plug and lead fitted with a 13Amp fuse as standard. The plug is to be connected to a suitable mains socket. The wiring markings are as...
• Upon the water reaching the lower element sensor the solenoid will close and the element(s) will begin to heat the water. • Approximate heating times for the initial fill is: - EB3 – 12 minutes EB4 – 9 minutes EB6 – 9 minutes •...
IS09 ECN2087 User Instructions • Retain these instructions for future reference. • Ensure that the spillage tray is in the correct position before operating the appliance. • Care should be taken to avoid injury whilst operating the appliance at the water temperature is maintained at approximately 98 •...
IS09 ECN2087 De-scaling the Appliance It is recommended that the appliance be de-scaled regularly. Excessive scale deposits may become difficult to remove with some de-scaling products. • To de-scale the appliance, isolate the appliance from the water and electricity supply. •...
IS09 ECN2087 Maintenance Qualified personnel must carry out all maintenance work on the appliance. Before commencing work on the appliance the electricity and water supplies must be isolated. When replacing parts use only parts recommended by the manufacturer. De-scale the appliance regularly. Severe scale deposits may block the drain valve. Prodding through the tank-connector may puncture the drain hose.
IS09 ECN2087 Spare Parts Before removing and replacing any part on the appliance the appliance must be isolated from the water and electricity supply. Replacement of parts must be parts approved by the manufacturer. Some parts are not shown in the parts explosion diagrams, as they are non-serviceable. Tank Assembly Note: The tank lid is inclusive with the tank when the tank is ordered as a spare part.
IS09 ECN2087 Base Assembly Body Assembly The body manufactured as a complete part, panels are not available separately. The lid bezel is fitted to the lid; clips are required in the fitting. The tap bezel is screwed to the bodywork. The neon lens and neon housing are serviceable parts.
For multi-phase wiring of the EB6, remove the link wire at L1 & L2. Circuit Diagram The circuit diagram above is essentially for the EB3 as the element is powered via the thermostat. For the EB4 and EB6 switching of the contactor that powers the element(s) is made via the...
IS09 ECN2087 Replacing Parts Before removing and replacing any part on the appliance the appliance must be isolated from the water and electricity supply. Replacement of parts must be parts approved by the manufacturer. Thermostat • Remove the outer lid. •...
IS09 ECN2087 Neon • Remove the outer lid. • Remove the retaining screws from the back panel and slide the back panel vertically upward. • Remove the retaining screws from the access panel. • Loosen the tank-retaining bracket and ease that tank backward to gain access to the neon housing.
If possible please quote the product code of the part number you require. GUARANTEE STATEMENT Lincat Ltd guarantees its equipment to be free from defects in materials and workmanship for a period of 1 (one) year commencing from the date of purchase from the dealer, by the original owner.
Need help?
Do you have a question about the EB3 and is the answer not in the manual?
Questions and answers
What descaling compound should I use for Lincat Boiler
The Lincat EB3 boiler is supplied with a pack of de-scaling compound. Only parts recommended by the manufacturer should be used for maintenance, including descaling.
This answer is automatically generated
LINCAT water boiler EB3FX How to reset timer