MOUNTING AVANTA PLUS
158 mm
1
Check box contents. Ensure that all components are included. Report incomplete delivery to Broag.
LTALW7H000103a
Avanta Plus
(including pressure gauge and safety
valve)
2
Mounting Avanta Plus
Based on the guidelines and the required installation space, determine where to mount the Remeha Avanta Plus. In determining the boiler position, consider carefully the flue outlet position and any pluming consequences.
Read the Installation and service manual for more details and regulations for mounting the Avanta Plus.
1. Using the template determine and mark the position
of the three mounting holes, making sure the plate is
absolutely level.
3
Connecting external controls
X9
8
7
Connecting OpenTherm room controls
(e.g. the Remeha Celcia 15 or 20):
Mount the control in a reference room (usually the living room).
Connect the two-wire interface cables to connectors 7 and 8 of the X9
terminal strip. When using the Celcia 20 it is possible to add the outside
sensor to provide weather compensation with room adjustment.
Connect the outside sensor to connectors 1 and 2 of the X9 terminal strip.
condensate drain connection
3/4" (standard overflow pipe size)
Flow connection
ø 22 mm
Flue / Air inlet connection
ø 60 / 100 mm
Mounting frame
(including isolation valve set and
LTALW7H000105a
washers)
1
2
3
ø10 mm
2x
ø8 mm
1x
4
2. Drill the (Ø 10 mm) holes; Fit the (Ø 10 mm)
LTALW7H000114a
plugs; Fit (Ø 8 mm) screws into the plugs;
Check the mounting plate is level and tighten the
screws; Fit the DHW inlet (cold) valve set to the
mounting plate.
LTALW7H000126a
Connecting the (optional) two channel time clock.
• Live 230 V supply for the time clock - connect to connectors 1 (N) and
2 (L) on X2 terminal strip.
• For HTG - connect the 230 V output from time clock to connector 5 and
remove exist link between connectors 1 and 4 of the X2 terminal strip.
• For DHW - connect the 230 V output from time clock to connector 3
remove exist link between connectors 3 and 4 of the X2 terminal strip.
pipe safety valve
ø 15 mm
DHW outlet (hot)
ø 15 mm
Please read the instructions given on this template
before installing the Avanta Plus.
Nylon plugs and screws for
fixing mounting frame
3x
3x
3x
LTALW7H000134a
Copper tails
DHW inlet
(cold) valve set
LTALW7H000104b
LTALW7H000109a
ø10 mm
3. Fit fibre Washers on HTG Valves.
LTALW7H000116a
Suspend the boiler on mounting plate.
X2
gas connection
DHW outlet (cold)
ø 22 mm
WITH STANDARD MOUNTINGFRAME
Installation and service
manual
Instructie service
AvantaPlus
This document contains useful
and important information for the
correct installation, operation and
maintenance. Keep the Installation
and service manual in a safe
LTALW7H000110a
place together with the other boiler
documents.
Users guide
Reed the instructions carefully and
keep the document in a safe place.
LTALW7H000135a
Short users guide
Boiler Log Book and warranty
LTALW7H000111a
card.
See that the Boiler Logbook has been
completed by the engineer at each
service and keep it in a safe place.
LTALW7H000132a
LTALW7H000117a
4. Connect the valves to the boiler
remembering to fit fibre washers supplied.
Connect the supplied copper tails to the
isolating valves.
4
Hang up the
Short users guide
LTALW7H000127a
Hang this card underneath or close to the boiler.
return connection
ø 15 mm
ø 22 mm
LTALW7H000118b
LTALW7H000128b
LTALW7H000129a
59751-1005
�����
LTALW7H000101b
Need help?
Do you have a question about the Avanta Plus and is the answer not in the manual?
Questions and answers