Please ensure that the installer has fully completed the Benchmark Checklist on the inside
back pages of the installation instructions supplied with the product and that you have signed
it to say that you have received a full and clear explanation of its operation. The installer is
legally required to complete a commissioning checklist as a means of complying with the
appropriate Building Regulations (England and Wales).
All installations must be notified to Local Area Building Control either directly or through
a Competent Persons Scheme. A Building Regulations Compliance Certificate will then
be issued to the customer who should, on receipt, write the Notification Number on the
Benchmark Checklist.
This product should be serviced regularly to optimise its safety, efficiency and performance.
The service engineer should complete the relevant Service Record on the Benchmark
Checklist after each service.
The Benchmark Checklist may be required in the event of any warranty work and as
supporting documentation relating to home improvements in the optional documents section
of the Home Information Pack.
Broag Ltd.
Remeha House
Molly Millars Lane
RG41 2QP WOKINGHAM,
Berks.
Tel: +44 118 9783434
Fax: +44 118 9786977
© Copyright
Internet: uk.remeha.com
All technical and technological information contained in these
technical instructions, as well as any drawings and technical
descriptions furnished by us remain our property and may not be
E-mail: boilers@broag-remeha.com
multiplied without our prior consent in writing.
www.avantarange.com

User Guide

Remeha Avanta Range
12v | 18v | 24v

Advertisement

loading
Need help?

Need help?

Do you have a question about the Avanta Series and is the answer not in the manual?

Questions and answers

Summary of Contents for REMEHA Avanta Series

  • Page 1: User Guide

    The Benchmark Checklist may be required in the event of any warranty work and as supporting documentation relating to home improvements in the optional documents section of the Home Information Pack. User Guide Remeha Avanta Range 12v | 18v | 24v Broag Ltd. Remeha House...
  • Page 2 Remeha Avanta 12v / 18v / 24v SHORT USER GUIDE 2. Disable boiler without frost protection, during longer periods of non-use 230 V SAFETY • Switch off the boiler • Switch off controls • Isolate boiler at the switch spur unit.
  • Page 3 Remeha Avanta 12v / 18v / 24v CHANGING BOILER SETTINGS 4. Changing P4 setting: Eco or comfort mode 1. Changing P1 setting: flow temperature of water in central heating No hot water system Warning: the system boiler in combination with an external calorifier will not warm up the calorifier in the Eco-mode.