1-5-5 Drum section
(1) Detaching and refitting the drum unit
Procedure
1. Remove the developer unit.
(See page 1-5-13)
2. Remove the lock lever L.
3. Remove the lock lever R by sliding
backward.
4. Remove the drum unit by sliding
forward.
5. Check or replace the drum unit and refit
all the removed parts.
(2) Detaching and refitting the chager roller unit
Procedure
1. Release the lock lever and then remove
the chager roller unit.
2. Check or replace the charger roller unit
and refit all the removed parts.
Drum unit
Lock
lever L
Figure 1-5-23
Lock lever
Figure 1-5-24
1-5-15
2LV/2L1/2L2/2MS/2MT
Lock
lever R
Main chager roller unit
Durm unit
Need help?
Do you have a question about the ECOSYS FS-4300DN and is the answer not in the manual?
Questions and answers