PISTON & CONNECTING ROD (Continued)
gaps are staggered, and neither is in line with the oil
ring rail gap (Fig. 82).
(3) Before installing the ring compressor, ensure
the oil ring expander ends are butted and the rail
gaps are located as shown in (Fig. 82). As viewed
from top.
(4) Immerse the piston head and rings in clean
engine oil, slide the ring compressor, over the piston
(Fig. 75). Be sure position of rings does not
change during this operation.
Fig. 75 Installing Piston
(5) The weight stamp designation L or H will be in
the front half of the piston should face toward the
front of the engine (Fig. 72).
(6) Rotate crankshaft so that the connecting rod
journal is on the center of the cylinder bore. Lubri-
cate connecting rod journal with clean engine oil.
(7) Install connecting rod upper bearing half into
connecting rod. Install Special Tool 8189, connecting
rod guides onto connecting rod (Fig. 74).
(8) Insert rod and piston assembly into cylinder
bore and carefully guide rod over the crankshaft jour-
nal.
(9) Tap the piston down in cylinder bore, using a
hammer handle. At the same time, guide connecting
rod into position on connecting rod journal.
(10) Remove Special Tool 8189, connecting rod
guides.
NOTE: The connecting rod cap bolts should not be
reused.
(11) Before installing the NEW bolts, the threads
should be coated with clean engine oil.
(12) Install connecting rod lower bearing half into
connecting rod cap. Install connecting rod cap.
ENGINE 2.0L DOHC
(13) Install each bolt finger tight then alternately
torque each bolt to assemble the cap properly.
(14) Tighten the connecting rod bolts using the 2
step torque-turn method. Tighten according to the
following values:
CAUTION: Do not use a torque wrench for the sec-
ond step.
1. Tighten the bolts to 27 N·m (20 ft. lbs.).
2. Tighten the connecting rod bolts an additional
1/4 TURN.
(15) Using a feeler gauge, check connecting rod
side clearance (Fig. 76). (Refer to 9 - ENGINE -
SPECIFICATIONS) for connecting rod side clearance.
(16) Install the cylinder head (Refer to 9 -
ENGINE/CYLINDER HEAD - INSTALLATION).
(17) Install the oil pan (Refer to 9 - ENGINE/LU-
BRICATION/OIL PAN - INSTALLATION).
CONNECTING ROD BEARINGS
STANDARD PROCEDURE
CONNECTING ROD - FITTING
(1) For measuring connecting rod bearing clear-
ance procedure and use of Plastigage(Refer to 9 -
ENGINE - STANDARD PROCEDURE). For bearing
clearance refer to Engine Specifications. (Refer to 9 -
ENGINE - SPECIFICATIONS)
NOTE: The rod bearing bolts should not be reused.
(2) Before installing the NEW bolts the threads
should be oiled with clean engine oil.
(3) Install each bolt finger tight then alternately
torque each bolt to assemble the cap properly.
(4) Tighten the connecting rod bolts using the 2
step torque-turn method. Tighten according to the
following values:
CAUTION: Do not use a torque wrench for the sec-
ond step.
1. Tighten the bolts to 27 N·m (20 ft. lbs.).
2. Tighten the connecting rod bolts an additional
1/4 TURN.
(5) Using a feeler gauge, check connecting rod side
clearance (Fig. 76). Refer to clearance specifications
(Refer to 9 - ENGINE - SPECIFICATIONS).
9 - 119

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PT Cruiser and is the answer not in the manual?

Questions and answers

Aaron Slaughter
February 28, 2025

Is there a diagram showing how the fuel injector harness runs?

Chris
April 19, 2025

My timing belt broke. How should I move the camshaft sprockets to align them? It says if I move them individually the valves may be damaged.

Table of Contents

Save PDF