Cr Unit - Epson Stylus CX7300 Service Manual

Epson stylus color inkjet printer service manual
Hide thumbs Also See for Stylus CX7300:
Table of Contents

Advertisement

EPSON Stylus CX7300/CX7400/DX7400/NX200/TX200 series/SX200 series/Stylus CX8300/CX8400/DX8400/NX400/TX400 series/SX400 series Revision C
Tighten the screws in the order given in
Follow the steps below to install the Extension Spring 10.99 to
the Upper Paper Guide.
1.
Attach the one end of the Extension Spring 10.99 to the
hook of the Upper Paper Guide.
2.
Attach the other end of the Extension Spring 10.99 to the
hook of the Main Frame with longnose pliers.
Extension Spring 10.99
Hook
Figure 4-75. Installing the Extension Spring 10.99
Be sure to install the Grounding Spring referring to
4-64
and
Figure
Whenever the Main Frame is removed/replaced, the required
A D J U S T M E N T
R E Q U I R E D
adjustments must be carried out.
Chapter 5 " ADJUSTMENT" (p.141)
After replacing the Main Frame, be sure to perform the
specified lubrication.
Chapter 6 " MAINTENANCE" (p.151)
DISASSEMBLY/ASSEMBLY
Figure
4-73.
Hook
4-65.
Disassembling the Printer Mechanism

4.5.14 CR Unit

Parts/Components need to be removed in advance
Document Cover/ASF Cover/Scanner Unit/Panel Unit/Upper Housing/Card Slot
Cover/Lower Housing/Main Board Unit/Left Frame/Front Frame/Right Frame/CR
Motor/CR Scale/Hopper/Main Frame Assy/Printhead
Removal procedure
1.
Remove the screw (x1) that secures the CR Scale Holder, and remove the CR
Scale Holder.
2.
Move the CR Unit in the direction of the arrow to remove the CR Unit.
CR Unit
Figure
3.
Release the Timing Belt from the groove of the CR Unit.
C.B.S. 3x6, F/Zn-3C (8±1kgfcm)
Figure 4-76. Removing the CR Unit (1)
CR Scale Holder
124
Confidential

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents