Path Operation List (When Product Name Is Clicked) - Hitachi MK-96RD626-07 User Manual

Universal volume manager
Table of Contents

Advertisement

Path Operation List (When Product Name is Clicked)

When you click a product name in the Path Operation tree, WWN which
indicate the port in the external storage system is displayed in the list.
Figure 4-7
The Path Operation list consists of:
WWN
The following items are displayed:
– WWN: WWN indicating the port in the external storage system that the
connection setting is completed.
– QDepth: The number of Read/Write commands which can be issued
(queued) to the external volume at a time.
– I/O TOV: Value specified as the time over of the I/O to the external
volume.
– Path Watch: The time from when the connection of all the cross-
subsystem paths to the external volume have been down to when the
external volume is blocked.
– Status: Status of the cross-subsystem path. For the displayed statuses,
see Table 4-7.
Pop-up menu
Right-click a row in the Path Operation list to perform the following
operations from the pop-up menu.
Table 4-9
Pop-up Menu
Disconnect Paths
Check Paths
Change WWN
Parameter
Hitachi Universal Storage Platform V/VM Universal Volume Manager User's Guide
Path Operation List when Product Name is Clicked
Pop-up Menu in the Path Operation List (when Product Name
is clicked)
Allows you to stop the use of the cross-subsystem paths which are connected
to the selected external port of the local storage system.
Allows you to restart the use of the cross-subsystem paths which are
connected to the selected external port of the local storage system.
Displays the Change WWN Parameter dialog box. This dialog box allows you to
change the parameters on the port of the external storage system.
Using the Universal Volume Manager GUI
Description
4-17

Advertisement

Table of Contents
loading

Table of Contents