2.0 Unpacking/Inspection/Storage/Disposal
2.1
Unpacking the UPS Equipment
1) Upon receipt of the UPS, a careful inspection for shipping damage should be made.
2) For units shipped in a crate, remove the screws that attach the shipping crate panels to
each other and to the pallet. Remove the crate and foam packing material.
3) Unbolt the unit from the shipping pallet.
4) Lift the UPS from the pallet using a forklift that has sufficient capacity. Approach the
UPS only from the front or rear.
T O S H I B A
14