Installation Steps - HP 634041-006 Deployment Manual

Solutions with 6gb sas bl switches and external sas storage enclosures
Table of Contents

Advertisement

Installation steps

1.
Set up the rack and its power distribution units (PDUs).
2.
If applicable, install the Tape Library or Autoloader.
3.
Install one or more P71 1m, P712m, or P721m/P731m controller on each server blade.
For detailed instructions on installing the P71 1m, P712m, or P721m/P731m, see the HP Smart
Array Controllers User Guide.
Make sure to install the P71 1m, P712m, or P721m/P731m controller in a expansion slot that
maps to the planned interconnect bays of the switches. For more information about mappings,
see
"Device relationships and mapping information" (page
Record the slot number in which you installed the controller on the provided spaces in
and P71 1m, P712m, and P721m/P731m controller worksheet" (page
4.
Install the BladeSystem c-Class enclosure and the blade devices.
For detailed instructions on installing the BladeSystem c-Class enclosure and its devices, see
the user documents for each device.
a.
Before installing the BladeSystem c-Class enclosure and its component devices, record
important device information in
b.
Rack the BladeSystem enclosure.
c.
Install the following devices in the BladeSystem enclosure:
d.
Connect the Onboard Administrator cables and power cords.
If the MSA 2040 SAS or P2000 G3 SAS MSA is already racked, do not connect SAS
cables between the switches and the MSA controller at this time. Connect them only after
ensuring that the latest available firmware is installed on the MSA controllers.
e.
Apply power to the rack and turn on the AC circuit breakers for the BladeSystem enclosure.
Power is automatically applied to or removed from the devices as power is applied or
removed from the BladeSystem enclosure. As the devices power on, they automatically
perform a series of Power-On Self-Tests. (POST)
Confirm successful startup of the BladeSystem enclosure and its components. View the
OA module display, the Insight Display, and device LEDs to monitor the progress of the
Power-On Self-Tests. For details, see the Onboard Administrator user guide and user
documents for the devices.
f.
Complete the HP BladeSystem Insight Display installation wizard. (HP BladeSystem
c3000/c7000 Enclosure Quick Setup Instructions)
When the BladeSystem enclosure is powered up for the first time, the Insight Display
launches an installation wizard to guide you through the configuration process. After
configuring the BladeSystem enclosure, the Insight Display verifies that there are no
installation or configuration errors.
56
Installation best practices and procedures
Server blades with P71 1m, P712m, or P721m/P731m controllers attached
Power supplies
Fans
Onboard Administrator modules
HP 6Gb SAS BL Switches
IMPORTANT:
Be sure to install the HP 6Gb SAS BL Switches in BladeSystem
interconnect bays that map to the expansion slots in which the P71 1m, P712m, or
P721m/P731m controllers were installed in the servers. For more information, see
"Device relationships and mapping information" (page
"Solution summary worksheet" (page
50).
102).
101).
50).
"Server

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents