Connecting To Power; Power-On Self Test (Post) - GE D-GES7600 Series Installation And Operation Instructions Manual

General electric managed ethernet switches installation & operation instructions
Table of Contents

Advertisement

CONNECTING TO POWER

External Power
Step One: Wire the supplied AC power adapter to the "A" receptacle plug
at the front of the switch. — white stripe to pin 1 (+), black to pin 2 (-).
Step Two: Attach the plug into a standard AC outlet with the appropriate AC voltage.
Primary "A" Power Connector
To Primary Wall Supply
Note: The secondary supply must be equal to or less than the potential of the primary supply.

Power-On Self Test (POST)

The switch performs its Power-On Self Test (POST) when the power is applied to the switch.
During the POST, the switch CPU will:
- Perform a series of diagnostic procedures to make sure the
basic system is functioning properly
- Decompresses the main switching software runtime image from
the flash ROM into the DRAM area
User's Manual
(D7600-MM-E-CC Shown))
Manageable 8/9-Port Switch
Secondary "B" Power Connector
To Secondary Supply
16

Advertisement

Table of Contents
loading

Table of Contents