E.4 Cpe With C7000 Enclosure Configuration Device And Interconnect Bay Rules - HP Cluster Platform Express v2010 Overview

Workgroup system and cluster platform express overview and hardware installation guide
Hide thumbs Also See for Cluster Platform Express v2010:
Table of Contents

Advertisement

second, additional power strip is required for configurations that have an externally managed
InfiniBand switch.
CPE Configuration
CP Workgroup System basic
CP Workgroup System with external
control node and TFT7600
CP Workgroup System with SB40c
CP Workgroup System with optional
InfiniBand interconnect
1
(Assuming maximum power draw of 10A, 2080 watts versus a maximum specification of 2250 watts)
The Cluster Platform Express configuration tool will provide the appropriate number of c3000
enclosure power supplies and PDUs to meet the power requirements of the configuration.
E.4 CPE with c7000 Enclosure Configuration Device and Interconnect Bay
Rules
The following table summarizes the use of the device and interconnect bays for c7000 enclosures
in an HP Cluster Platform Express BladeSystem configuration. If the control node is a server
blade, it is installed in device bay 1 of the c7000 enclosure. Otherwise, device bay 1 is used for a
compute node. If the control node is a server blade and a storage blade is also required, the
storage blade is installed in device bay 2.
Bay
Use
Control
node/server
blade
Bay
Use
Server
blade
The following table summarizes the use of the interconnect module bays for c7000 enclosures in
HP Cluster Platform Express BladeSystem configurations with single-density server blades:
Bay
Use
Bay
Use
Bay
Use
Bay
Use
112
Configuration Rules for CPE BladeSystems
1
International
One 32A PDU
One 32A PDU
One 32A PDU
One 32A PDU
1
2
3
Storage
Server
blade
blade
(SB40c) or
server
blade
9
10
11
Server
Server
blade
blade
Interconnect Module Bay 1
HP GbE2c Module
Interconnect Module Bay 3
Not used
Interconnect Module Bay 5
InfiniBand Switch Module (double-width)
Interconnect Module Bay 7
Not used
North America
One 24A PDU
Two 24A PDUs
Two 24A PDUs
Two 24A PDUs
4
5
Server blade
Server
blade
12
13
Server blade
Server
blade
Interconnect Module Bay 2
Optional HP GbE2c Module (for external network)
Interconnect Module Bay 4
Interconnect Module Bay 6
Interconnect Module Bay 8
6
7
Server
Server
Server
blade
blade
blade
14
15
Server
Server
Server
blade
blade
blade
Not used
Not used
8
16

Advertisement

Table of Contents
loading

Table of Contents