E Configuration Rules For Cpe Bladesystems; E.1 Cp Workgroup System Device And Interconnect Bays; E.1.1 Hp Bladesystem C3000 Enclosure Device Bays (Front Of The C3000 Enclosure); E.1.2 Hp Bladesystem C3000 Enclosure Interconnect Bays (Rear Of The C3000 Enclosure) - HP Cluster Platform Express v2010 Overview

Workgroup system and cluster platform express overview and hardware installation guide
Hide thumbs Also See for Cluster Platform Express v2010:
Table of Contents

Advertisement

E Configuration Rules for CPE BladeSystems

This appendix provides the configuration and power distribution rules for CPE BladeSystem
configurations. The following sections discuss:
CP Workgroup System device and interconnect bays (see
CP Workgroup System fan bays (see
CP Workgroup System power and configuration rules (see
CPE with BladeSystem c7000 enclosure device and interconnect module bay rules (see
Section
E.4)
CPE with BladeSystem c7000 enclosure fan bay rules (see
CPE with BladeSystem c7000 enclosure power distribution rules (see

E.1 CP Workgroup System Device and Interconnect Bays

Section E.1
and
c3000 enclosures in CP Workgroup System configurations.

E.1.1 HP BladeSystem c3000 Enclosure Device Bays (Front of the c3000 Enclosure)

The following table provides the HP BladeSystem c3000 enclosure's device bay rules for CP
Workgroup System. If the control node is a server blade, it is installed in device bay 5. Otherwise,
device bay 5 is used for a compute node. If the control node is a server blade and a storage blade
is also required, the storage blade is installed in device bay 6.
Bay
Use
4
Server Blade
3
Server Blade
2
Server Blade
1
Server Blade
E.1.2 HP BladeSystem c3000 Enclosure Interconnect Bays (Rear of the c3000
Enclosure)
The following table provides the HP BladeSystem c3000 enclosure's interconnect module bay
rules for CPE Workgroup systems.
Bay
Use
Bay
Use

E.2 CP Workgroup System Fan Bays

If more than half of the device bays are populated (for example, there are more than four server
blades) the enclosure is configured with six fans. Otherwise, the enclosure is configured with
four fans.

E.3 CP Workgroup System Power and Configuration Rules

To meet the power requirements, CPE c3000 configurations use two single-phase PDUs as shown
in the following table. An additional power strip is required for the control node and TFT. A
Section E.1.2
summarize the use of the device bays and interconnect bays for
Interconnect Module Bay 1
HP GbE2c Module
Interconnect Module Bay 3
Section
E.2)
Bay
Use
8
Server Blade
7
Server Blade
6
Storage Blade (SB40c) or Server Blade
5
Control Node/Server Blade
InfiniBand Switch Module (double-width)
E.1 CP Workgroup System Device and Interconnect Bays
Section
E.1)
Section
E.3)
Section
E.5)
Section
E.6)
Interconnect Module Bay 2
Not Used
Interconnect Module Bay 4